MIL-R-46837B (MI)
3.8 Workmanship. Raceways surfaces shall be free of foreign matter, contain no sharp edges or burrs, and shall be smooth with uniform color. There shall be no cracks or splits in the material, however, slight enamel crazing or scoring on the raceway may be acceptable.
4. QUALITY ASSURANCE PROVISIONS
4.1 Responsibility for inspection. Unless otherwise specified in the contract or purchase order, the contractor is responsible for the performance of all inspection requirements (examinations and tests) as specified herein. Except as otherwise specified in the contract or purchase order, the contractor may use his own or any other facilities suitable for the performance of the inspection requirements specified herein, unless disapproved by the Government. the Government reserves the right to perform any of the inspections set forth in this specification where such inspections are deemed necessary; to assure supplies and services conform to prescribed requirements.
4.1.1 Responsibility for compliance. All items shall meet all requirements of sections 3 and 5. The inspection set forth in this specification shall become a part of the contractor's overall inspections system or quality program. The absence of any inspection requirements in the specification shall not relieve the contractor of the responsibility of ensuring that all products or supplies submitted to the Government for acceptance comply with all requirements of the contract. Sampling inspection, as part of manufacturing operations, is an acceptable practice to ascertain conformance to requirements, however, this does not authorize submission of known defective
material, either indicated or actual, nor does it commit the government to accept defective material.
4.2 Inspection.
4.2.1 Inspection lot. A lot, for inspection purposes, shall consist of raceways that are the same material, type, finish, size and manufactured under essentially the same conditions.
4.2.2 Quality conformance inspection. Unless otherwise specified (see 6.2), quality conformance inspection shall be conducted in accordance with Table V. Quality conformance inspection shall be applied to each lot of completed items being offered for fulfillment of the contract. Quality conformance inspections shall consist of the following:
a. Examination (4.2.2.1)
b. Tests (4.2.2.2)
c. Packaging inspection (4.2.2.3)
7
For Parts Inquires call Parts Hangar, Inc (727) 493-0744
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business