MIL-PRF-85725A(AS)
4.2 First article inspection. First article inspection shall be performed on two racks when a
first article sample is required (see 3.1 and 6.2). This inspection shall consist of the examination
and tests listed in table II.
TABLE II. First article inspection.
Inspection
Requirement
Method
paragraph
Paragraph
Examination
4.5.1
3.2
Materials
4.5.1
3.3
Design
4.5.1
3.5
Dimensions
4.5.1.1
3.6
Weight
4.5.1
3.7
Marking
4.5.1
3.8
Workmanship
4.5.2.1
3.4.1.1
High temperature
4.5.2.2
3.4.1.2
Low temperature
4.5.2.3
3.4.1.3
Temperature shock
4.5.2.4
3.4.1.4
Humidity
4.5.2.5
3.4.1.5
Fungus
4.5.2.6
3.4.1.6
Salt fog
4.5.2.7
3.4.1.7
Acceleration
4.5.2.8
3.4.1.8
Vibration
4.5.2.9
3.4.1.9
Shock
4.5.2.10
3.4.1.10
Crash safety
4.5.3.1
3.4.2.1
Guide rails
4.5.3.2
3.4.2.2
Tier insertion/extraction
1/
4.5.3.3
3.4.2.3
Pressure drop
4.5.3.4
3.4.2.4
Leakage
4.5.4
3.4.3
Thermal
4.5.5.1.1
3.4.4.1.1
Shielding outside-to-inside
4.5.5.1.2
3.4.4.1.2
Shielding tier-to-tier
1/ This test is not applicable for Format E designs.
4.3 Conformance inspection. Conformance inspection shall consist of Groups A, B, and C
inspections.
4.3.1 Group A inspection. Group A inspection shall consist of the examination shown in
table III. Group A inspection shall be performed on those samples selected from an inspection lot
in accordance with ASQC-Z1.4, general inspection level II. An inspection lot shall consist of all
9