MIL-PRF-85726B(AS)
TABLE III. First article inspection.
Inspection
Requirement
Method
Paragraph
Paragraph
Examination
Materials
3.2
4.5.1
Size
3.3.1
4.5.1
Modularity
3.3.2
4.5.1
Interface and dimensional
requirements
Backplane interface
3.3.3
4.5.1
Enclosure hold-downs
3.3.4
4.5.1
Module types
3.3.5
4.5.1
Escape of fluids
3.3.6
4.5.1
Cooling
3.3.7
4.5.1
Fluid entrapment
3.3.8
4.5.1
Module retainer
3.3.9
4.5.1
Wiring harness
3.3.10
4.5.1
Meters
3.3.11
4.5.1
Input/output connectors
3.3.12
4.5.1
Nameplate
3.3.13
4.5.1
Performance requirements
High temperature
3.4.1
4.5.2.1
Low temperature
3.4.2
4.5.2.2
Temperature shock
3.4.3
4.5.2.3
Humidity
3.4.4
4.5.2.4
Fungus
3.4.5
4.5.2.5
Salt fog
3.4.6
4.5.2.6
Acceleration
3.4.7
4.5.2.7
Vibration
3.4.8
4.5.2.8
Shock
3.4.9
4.5.2.9
Crash safety
3.4.10
4.5.2.10
Thermal effectiveness
3.4.11
4.5.3.1
Thermal leakage
3.4.12
4.5.3.2
Electromagnetic shielding effectiveness
3.4.13
4.5.4.1
Outside-to-inside shielding
3.4.14
4.5.4.2
effectiveness
4.3.1 Group A inspection. Group A inspection shall consist of the examination shown in
table IV. Group A inspection shall be performed on those samples selected from an inspection
lot in accordance with ASQC-Z1.4, general inspection level II (see 6.5).
10
For Parts Inquires call Parts Hangar, Inc (727) 493-0744
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business