MIL-PRF-85726B(AS)
TABLE IV. Group A inspection.
Inspection
Requirement
Method
Paragraph
Paragraph
Examination
Materials
3.2
4.5.1
Interface and dimensional
requirements
Modularity
3.3.2
4.5.1
Backplane interface
3.3.3
4.5.1
Module types
3.3.5
4.5.1
Escape of fluids
3.3.6
4.5.1
Cooling
3.3.7
4.5.1
Fluid entrapment
3.3.8
4.5.1
Module retainer
3.3.9
4.5.1
Wiring harness
3.3.10
4.5.1
Meters
3.3.11
4.5.1
Input/output connectors
3.3.12
4.5.1
Nameplate
3.3.13
4.5.1
4.3.2 Group B inspection. Group B inspection shall consist of the examination listed in
table V. Group B inspection shall be performed on sample units which have been subjected to
and have passed the group A inspection. The sampling for Group B inspection shall be in
accordance with ASQC-Z1.4, general inspection level II.
TABLE V. Group B inspection.
Inspection
Requirement
Method
Paragraph
Paragraph
Examination
Interface and dimensions
Size
3.3.1
4.5.1
Enclosure hold-downs
3.3.4
4.5.1
4.3.3 Group C inspection. Group C inspection shall consist of the inspections listed in table
VI, performed in the order shown. Group C inspection shall be performed on nine units of the
same design which have passed groups A and B inspections. The units shall not be subjected to
any screening test prior to Group C inspection.
4.3.3.1 Failures. If one or more units fail to pass the group C inspection, the entire sample
shall be considered to have failed.
11
For Parts Inquires call Parts Hangar, Inc (727) 493-0744
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business